My latest GoMining farm update shows progress across three areas that matter to my long-term strategy: mining power, energy efficiency and locked GMT.
Since my previous update on 22 September, my Greedy Machine has grown, my energy efficiency has improved, and I have increased my locked GMT position.
Here are my current numbers:
- Mining power: 508.5 TH
- Energy efficiency: 13.966 W/TH
- Locked GMT: 40,700 GMT
My next goals are straightforward: reach Diamond II and improve my Greedy Machine’s energy efficiency to 12 W/TH.
I’m not simply trying to build the biggest farm possible. I want to build a farm that can sustain itself before expanding further.
As always, my philosophy remains:
Build your Farm first. Then expand your kingdom.

GoMining Farm Update: How My Farm Has Improved
1. Mining Power: Growing to 508.5 TH
My mining power has increased from 501 TH to 508.5 TH since 22 September.
That’s an additional 7.5 TH, representing approximately 1.50% growth.
More TH gives my Greedy Machine greater potential to generate BTC. However, mining power alone doesn’t determine profitability. Bitcoin’s price, network difficulty and operating costs all affect the economics.
My objective is to continue growing my mining power without allowing operating costs to get ahead of the financial foundation supporting it.
2. Energy Efficiency: Improving to 13.966 W/TH
My energy efficiency has improved from 14.56 W/TH to 13.966 W/TH.
That’s a reduction of 0.594 W/TH.
This matters because energy efficiency determines how much electricity is required to operate a given amount of mining power. A lower W/TH rating means less electricity consumption for the same TH.
My next target is 12 W/TH.
I estimate that reaching this level will cost approximately US$2,700, based on an upgrade cost of around US$2.67 per TH per 1 W/TH.
This is an investment I need to evaluate carefully. An EE upgrade requires capital upfront, but its benefits can continue to accumulate through lower electricity consumption over time.
The goal is not to upgrade simply because a lower W/TH number looks better. The upgrade must make economic sense.
3. Locked GMT: Building My Financial Foundation
My locked GMT has increased from 35,500 GMT to 40,700 GMT.
That’s an additional 5,200 GMT, bringing my locked position approximately 14.65% higher than it was at the previous update.
My next milestone is 50,000 GMT.
At my current position, I need another 9,300 GMT to reach that target. Based on a GMT price assumption of approximately US$0.37, I estimate the additional purchase would cost around US$4,000.
Locked GMT is an important part of my strategy because it supports my position in the GoMining ecosystem, including VIP progression and the benefits associated with token locking.
I’m not treating it as an afterthought. I want to build this financial foundation alongside my mining farm.
GoMining Farm Update: My Next Two Goals
My next steps focus on strengthening the farm before committing to further TH expansion.
Goal 1: Reach Diamond II
With 40,700 GMT locked, I have reached 81.4% of my 50,000 GMT target.
I need another 9,300 GMT, with an estimated cost of approximately US$4,000.
My Luminar NFT provides an additional VIP level when used as my avatar. This gives me access to the benefits of the next VIP tier while I continue building towards the underlying requirements.
The important point is that my VIP progression is part of a broader strategy. I want the benefits to support my farm’s economics rather than accumulate GMT purely for the sake of reaching another badge.
Goal 2: Improve Energy Efficiency to 12 W/TH
My second goal is to upgrade my Greedy Machine from 13.966 W/TH to 12 W/TH.
The estimated cost is approximately US$2,700.
These two goals represent different types of investment:
- Locked GMT strengthens my financial foundation and supports VIP-related benefits.
- EE upgrades reduce the energy burden of operating my mining power.
Both are important, but they serve different purposes. I need to consider their costs, benefits and timing rather than automatically prioritising one over the other.
The GoMining VIP Roadmap: From Diamond II to Legend I
My Luminar NFT gives me a +1 VIP level when it is active as my avatar. For my progression calculations, I use the preceding tier’s locked-GMT requirement to determine the effective requirement for each displayed tier.
Here is the roadmap based on my current 40,700 GMT locked.
| Target VIP level | Effective GMT requirement | Current progress | GMT still needed |
|---|---|---|---|
| Diamond II | 50,000 | 81.4% | 9,300 |
| Diamond III | 70,000 | 58.1% | 29,300 |
| Diamond IV | 90,000 | 45.2% | 49,300 |
| Diamond V | 120,000 | 33.9% | 79,300 |
| Legend I | 200,000 | 20.4% | 159,300 |
These figures show the scale of the journey ahead. Diamond II is relatively close, but the higher tiers require a much larger locked GMT position.
VIP requirements and benefits can change, so I’ll continue checking the requirements in my account as I progress.
For now, the priority is to reach 50,000 GMT while continuing to improve my Greedy Machine’s energy efficiency.
My Game Plan: Build the Farm Before Expanding TH
The plan is simple: continue growing my locked GMT position and improving energy efficiency so that I build a solid farm to support future TH expansion.
I don’t want to expand my mining power without considering the cost of sustaining it.
A larger farm can generate more BTC, but it also carries a larger operating burden. If the financial foundation isn’t strong enough, expansion can create additional pressure rather than improve the overall position.
This is where my strategy brings together three elements:
- GMT — The Farm: Wealth, supply and defence. It provides the financial foundation that helps support operating costs and improves resilience.
- TH — The Army: Power, growth and production. My Greedy Machine generates mining output, subject to Bitcoin’s mining economics.
- EE — The Armour: Efficiency, sustainability and risk control. Better energy efficiency reduces the burden of sustaining the Army.
Each element has a different role. I need all three to work together.
Take Care of Your Downsides. Your Upsides Will Take Care of Themselves.
This is the principle behind my approach to GoMining.
It’s tempting to focus entirely on increasing TH and chasing higher BTC production. But growth means little if the cost of sustaining that growth becomes too high.
I want to manage the downside first: operating costs, energy efficiency and the financial resources needed to support the farm.
Once the foundation is strong, I can look at expanding mining power with greater confidence.
That doesn’t guarantee profitability, and every investment still needs to be evaluated on its own merits. But it gives me a framework for making decisions without chasing growth at any cost.
My immediate priorities remain clear:
- Reach 50,000 GMT locked and progress towards Diamond II.
- Improve my Greedy Machine’s efficiency to 12 W/TH.
- Build a stronger financial foundation before expanding TH further.
Build your Farm first. Then expand your kingdom.
I’ll keep tracking these milestones in every GoMining farm update as I work towards a more sustainable and efficient mining farm.
Leave a Reply